The Spezia blog

Research on AI, with the numbers and the sources.

Original analysis from Spezia's own data and from filings, papers and official records: the data center build-out and the power behind it, who is paying, the rules, jobs, models and security. Every figure names its source and the day it was read.

LatestAnalysis

56%

of 1 GW+ projects are stuck mainly on power

Gigawatt data centers are 2.7 times as likely to be stuck on power

Power is the main thing holding back 56% of the 87 U.S. data center projects that plan 1 GW or more, against 21% of projects under 500 MW. That makes gigawatt campuses 2.7 times as likely to be stuck on power. Across all 285 GW in development, power is the main limit on 53% of the capacity. Equipment is the main limit on 1 of the 87 gigawatt projects.

Updated November 10, 2026

More research

How we publish

  • Every figure has a source

    Each number links to the report, filing or dataset it came from, and each analysis says how it was made.

  • Counted once

    A story that fourteen stations run is one event, not fourteen. Records of one project are merged before anything is counted.

  • Dated, and kept current

    Every post shows the day its data was read. Posts are updated when the numbers move, and the date says so.

  • Plain about what we know

    Facts, reported claims and Spezia's own estimates are kept apart. Estimates are shown only for groups large enough to mean something.

Spezia is a product of Inova Platforms, Inc.. About Spezia

Ask your own question of the same data.

Spezia answers from its own database, shows the chart or table behind the answer, and cites every figure. Free to start. No card.

See Ask Spezia