See where the power for AI is coming from.
Planned power plants from the U.S. government's own inventory, matched to the data center projects they sit next to, with planned capacity by state and the grid and interconnection news that decides which projects get built.
Part of Team. A free account opens the whole build-out 3 days a month, so you can see it before you pay. Compare plans
The build-out right now
Real output from Spezia, read from the same data the tool uses. Every line links to its source.
- U.S. projects tracked
- 1,047
- Approved or under construction
- 408
- Capacity on those projects
- 204.6 GW
- States with active projects
- 41
- Announced343
- Approved118
- Under construction290
- Operational91
- Blocked or paused27
- TX84 active
- VA25 active
- IN20 active
- MS15 active
- CO14 active
1,047 project files, with owners, builders and trades, are inside.
Continue free →Free account, no card. A free account previews Power and grid watch before you choose a plan.
Counts from the latest weekly research run. Project files, owners, builders and trades are inside the Team plan.
What you get
Plants tied to data centers
Planned generation within reach of a tracked project, or judged to serve data center load.
Capacity by state
Where new megawatts are planned, by fuel and by year.
The grid news
Interconnection queues, utility deals and regulator decisions from the last 30 days.
How it works
- 1Open Power.
- 2Check planned capacity in your states.
- 3Open a plant or a grid story for the source.
Who uses it
Questions about Power and grid watch
What is the source for the plants?
The U.S. Energy Information Administration's monthly inventory of planned and operating generators.
Which plan includes it?
Team. A free account opens the whole build-out 3 days a month.
Research from this data
Analysis written from what Power and grid watch tracks, with the sources and the day each figure was read.
- Power and the gridAnalysis56%of 1 GW+ projects are stuck mainly on power
Gigawatt data centers are 2.7 times as likely to be stuck on power
Power is the main limit on 56% of U.S. data center projects of 1 GW or more, against 21% of small ones. The data, and what utilities are doing.
- Power and the gridAnalysis432planned power plants within 40 km of a data center project
432 planned power plants sit within 40 km of a data center project
83.8 GW of planned U.S. power capacity sits within 40 km of a tracked data center project, and 42% of it is gas. EIA data, matched to the tracker.
- The AI build-outGuide47AI data center terms in plain words
AI data center glossary: 47 terms in plain words
47 AI data center terms in plain words: MW and GW, critical IT load, interconnection, behind-the-meter power, EPC, commissioning, capex and more.
Often used with
1,000+ U.S. data center projects with status, size and who is involved.
See it liveData center map
TeamEvery tracked project on the map, by stage and size.
See it liveAI Progress
FreeReleases, benchmarks and an outlook for the next 3 to 24 months.
See it live
See where the power for AI is coming from.
Part of Team. A free account opens the whole build-out 3 days a month, so you can see it before you pay.